Manual Testing Multiple Choice Questions and Answers for freshers and Experienced pdf free download

1. Methodologies adopted while performing Maintenance Testing:
2. Which of the following is true about Formal Review or Inspection:i. Led by Trained Moderator (not the author).ii. No Pre Meeting Preparationsiii. Formal Follow up process.iv. Main Objective is to find defects 

3. The Phases of formal review process is mentioned below arrange them in the correct order.i. Planningii. Review Meetingiii. Reworkiv. Individual Preparationsv. Kick Offvi. Follow Up
4. Splitting project into tasks and estimate time and resources required to complete each task called as Project Scheduling
5. White Box Techniques are also called as :
6. What is an equivalence partition (also known as an equivalence class.?
7. The Test Cases Derived from use cases
8. Exhaustive Testing is
9. Which of the following is not a part of the Test Implementation and Execution Phase
10. Which of the following techniques is NOT a White box technique?
11. A Project risk includes which of the following
12. In a risk-based approach the risks identified may be used to :

i. Determine the test technique to be employedii. Determine the extent of testing to be carried outiii. Prioritize testing in an attempt to find critical defects as early as possible.iv. Determine the cost of the project 
13. Which of the following is the task of a Tester?i. Interaction with the Test Tool Vendor to identify best ways to leverage test tool on the project.ii. Prepare and acquire Test Dataiii. Implement Tests on all test levels, execute and log the tests.iv. Create the Test Specifications 
14. The Planning phase of a formal review includes the following :
15. A Person who documents all the issues, problems and open points that were identified during a formal review.

16. Who are the persons involved in a Formal Review :-i. Managerii. Moderatoriii. Scribe / Recorderiv. Assistant Manager
17. Which of the following is a Key Characteristics of Walk Through
18. What can static analysis NOT find?
19. Incidents would not be raised against:
20. A Type of functional Testing, which investigates the functions relating to detection of threats, such as virus from malicious outsiders. 

21. Which of the following is not a major task of Exit criteria?
22. Testing where in we subject the target of the test , to varying workloads to measure and evaluate the performance behaviors and ability of the target and of the test to continue to function properly under these different workloads.
23. Testing activity which is performed to expose defects in the interfaces and in the interaction between integrated components is :
24. Static analysis is best described as:
25. One of the fields on a form contains a text box which accepts alpha numeric values. Identify the Valid Equivalence class 

26. Reviewing the test Basis is a part of which phase
27. Reporting Discrepancies as incidents is a part of which phase :-
28. Which of the following items would not come under Configuration Management?
29. Handover of Test-ware is a part of which Phase
30. The Switch is switched off once the temperature falls below 18 and then it is turned on when the temperature is more than 21. Identify the Equivalence values which belong to the same class. 

31. The approach/document used to make sure all the requirements are covered when writing test cases 
32. Executing the same test case by giving the number of inputs on same build called as
33. Control Charts is a statistical technique to assess, monitor, and maintain the stability of a process.
34. To check whether we are developing the right product according to the customer requirements are not. It is a static process 

35. To check whether we have developed the product according to the customer requirements r not. It is a Dynamic process.
36. Staff development plan describes how the skills and experience of the project team members will be developed.
37. It is a set of levels that defines a testing maturity hierarchy
38. A Non-Functional Software testing done to check if the user interface is easy to use and understand
39. The review and approved document (i.e. Test plan, System Requirement Specification’s) is called as
40. What are the Testing Levels?
41. Cost of quality = Prevention Cost + Appraisal cost + Failure cost.
42. A useful tool to visualize, clarify, link, identify, and classify possible cause of a problem. This is also called as “fishbone diagram” what is this?
43. It measures the quality of processes used to create a quality product.It is a system of management activities,It is a preventive process, It applies for entire life cycle & Deals with Process.
44. Variance from product specifications is called?
45. Verification is______.
46. White box testing is not called as___________.
47. Name the events that will be analyzed, Count the named incidents, Rank the count by frequency using a bar chart & Validate reasonableness of the analysis is called as
48. Retesting of a single program or component after a change has been made?
49. Requirement and Analysis, Design, Development or Coding, Testing and Maintenance is called as Software Development Life Cycle (SDLC)
50. The testing which is done by going thro' the code is known as,
51. Configuration Management Plan describes the Configuration Management procedures and structures to be used.
52.This type of testing method attempts to find incorrect or missing functions, errors in data structures or external database access, interface errors, Performance errors and initialization and Termination errors. It is called as
53. Phase Definition. It will come under
54. Software testing which is done without planning and Documentation is known as
55. Acceptance testing is known as
56. Retesting the entire application after a change has been made called as?
57. Boundary value analysis belongs to which testing method?
58. It measures the quality of a productIt is a specific part of the QA procedure, It is a corrective process,It applies for particular product & Deals with the product.
59. What are the Types of Integration Testing?
60. Product Risk affects The quality or performance of the software.
61. A metric used to measure the characteristic of documentation and code called as
62. Which is non-functional software testing?
63. The process that deals with the technical and management issues of software development called as?
64. Executing the same test case on a modified build called as
65. Which is Black-Box Testing method?
66. Business Risk affects The Organization developing or Procuring the software.
67. Stratification is a Technique used to analyze/divide a universe of data into homogeneous groups.
68. Automation Testing should be done before starting Manual testing.Is the above statement correct?
69. Earlier a defect is found the cheaper it is to fix it.
70. Informing to the developer which bug to be fix first is called as
71. Software Testing is a process of evaluating a system by manual or automatic means and verify that it satisfies specified requirements or identity differences between expected and actual results.
72. Retesting modules connected to the program or component after a change has been made?
73. An Important metric is the number of defects found in internal testing compared to the defects found in customer tests, Status of test activities against the plan, Test coverage achieved so far, comes under
74. Alpha testing will be done at,
75. SPICE Means
76. Requirements Specification, Planning, Test case Design, Execution,Bug Reporting & Maintenance This Life Cycle comes Under
77. It provides a set of levels and an assessment model, and presents a set of recommended practices that allow organizations to improve their testing processes.
78. Standards and procedures for managing changes in an evolving software product is called?
79. Path Tested = Number of Path Tested / Total Number of Paths
80. This Testing Technique examines the basic program structure and it derives the test data from the program logic; Ensuring that all statements and conditions executed at least once. It is called as
81. This type of test include, how well the user will be able to understand and interact with the system?
82. Defects generally fall into the following categories?
83. What is correct Software Process Cycle?
84. Conducted to validate that the application, database, and network they may be running on can handle projected volumes of users and data effectively. The test is conducted jointly by developers, testers, DBA’s and network associates after the system Testing called as
85. Maintenance Plan predicts the maintenance requirements of the system, maintenance costs and effort required
86. Beta testing will be done by
87. Validation plan describes the approach ,resources and schedule used for system validation
88. Integration, It will come under
89. Types of quality tools are Problem Identification Tools and Problem Analysis Tools.
90. Which Software Development Life cycle model will require to start Testing Activities when starting development activities itself
91. A metric used to measure the characteristic of the methods, Techniques and tools employed in developing, implementing and maintaining the software system called as
92. Check Sheet(Checklist. is considered a simple , but powerful statistical tool because it differentiates between two extremes.
93. Application should be stable. Clear Design and Flow of the application is needed for Automation testing.
94. Quality plan describes the quality procedures and standards that will be used in a project.
95. How severely the bug is effecting the application is called as
96. Project Risk affects The Schedule or Resources.
97. The name of the testing which is done to make sure the existing features are not affected by new changes
98. Management and Measurement, It will come under
99. AdHoc testing is a part of
100. Cost of Production = Right The First time cost(RTF. + Cost of Quality).
101. ------------- means under what test environment(Hardware, software set up. the application will run smoothly
102. Unit Testing will be done by
103. Beta testing will be done at
104. A Plan to overcome the risk called as

0 comments: